Planning tool
Access control door schedule
Build the door schedule an access control job starts from, and see the equipment and cable it adds up to.
Quantities
Doors
1
Door controllers
1
Two doors each
Readers
1
Power supplies
1
12 V 5 A, one per four doors
Exit buttons
1
Break-glass units
1
For magnetic and glass locks
Door contacts
1
Cable, with 10% spare
Doors on escape routes must release when the fire alarm sounds and open freely from inside. The fire officer's rules and the lock data sheet decide the final design.
Door 1: Single swing door
Method
How the numbers are worked out
Per door
Each door has a type, a lock, a reader and an exit device. Double doors count two locks and two readers; turnstiles and barriers use their built-in lock.
Counts
Controllers are two-door units. One 12 V 5 A power supply serves about four doors. Magnetic and glass locks each need a break-glass release. Cable is the run from the controller times the cores each device needs, plus 10% spare.
Assumptions and limits
- Doors on escape routes must release on a fire alarm and open freely from inside; fire rules decide the lock choice.
- Cable lengths are runs from the controller. Add cabling to the network switch if controllers are networked.
- Final selection follows the data sheets of the reader, lock and controller chosen.
Related
Nothing you type here leaves your device unless you choose to send it to us. These are planning estimates; a survey or the equipment data sheet confirms the final figures.
Want an engineer to check it?
Send us what you worked out and we will come back with a design based on the real site.